12 March 2008

Hand-In Number 2 Guidelines

Anything left in the room over the break will be thrown away. Any tool, past drawing, model, or backpack will be tossed into the trash. We need to clear and clean the studio over the spring break. If you need to leave something in the studio put it in a locker and secure it with a lock.

There will be a marked section location in the hall way for you to turn in your projects. You will turn in your cubic wire model, fiat wire model, section drawings, and your two foam models. Projects not left in the appropriate location will get a zero.

Format for turning in your projects will be as follows : Each of your models should be submitted with a piece of drafting tape affixed on its bottom that clearly displays your name and your section number. No boxes, no bags just place them together, side by side. Your section drawing set should be held together with two small binder clips and then rolled. When you roll your drawings make sure to physically roll to the binder clips, do not start the roll with the binder clips. The roll of drawings should be fully protected by a tube, a piece of paper, or a plastic sleeve. Your name and section number should be clearly displayed on the outside of the roll. This roll will be placed with your models.

If you are turning the projects in tomorrow and not Friday at 8am, then you can just place it at the top of the lockers in the hallway.

7 comments:

  1. Anonymous13/3/08 06:33

    can we turn our projects in thursday evening?

    ReplyDelete
  2. Anonymous13/3/08 15:22

    what is the combination to the door for when you want to come in after hours?

    ReplyDelete
  3. yes you can turn it in now if you want...each sections shelves/desks are set up for turning in your projects

    ReplyDelete
  4. Anonymous13/3/08 21:46

    should our 2 wire models include the tags on them identifying each piece that makes up the whole?

    ReplyDelete
  5. Anonymous14/3/08 13:47

    Marti,
    I was wondering if yall are going to post the assignment about the box that you and Rex talked about so we can start over spring break

    ReplyDelete
  6. Anonymous14/3/08 15:23

    I didn't know that we had to put our names on the projects at all. I put my project on the shelve and stuck drafting tape on the shelve with my name. I turned mine on Thursday because i had an early flight to catch. I asked my TA and he said thats all I need to do.

    ReplyDelete
  7. Anonymous14/3/08 17:48

    where are the pictures of the studio.

    ReplyDelete